Guigli Accelerated a 2 Year Sitework Schedule into a 2.5 Month Summer Break. This Included All Site Demolition, Blasting, Material Processing, Mass Earthwork, New Utilities, Reclaimed Gravel Bases, Roadways, Parking Lots, Curbing, Sidewalks & Loaming for Student Accessibility in Time for the School Year.
Guigli
administratorAYER SHIRLEY HIGH SCHOOL
Specifications
Location141 WASHINGTON STREET AYER, MA  | Area-  | Project Type Type-1  | 
Year November 4, 2025  | General ContractorCONSIGLI  | 
Description
Guigli Accelerated a 2 Year Sitework Schedule into a 2.5 Month Summer Break. This Included All Site Demolition, Blasting, Material Processing, Mass Earthwork, New Utilities, Reclaimed Gravel Bases, Roadways, Parking Lots, Curbing, Sidewalks & Loaming for Student Accessibility in Time for the School Year.